Contracting authority: Aubergenville city council assistant chief engineer: BET Bonnel and Gardel Mission: eco-building, architecture HQE Contractors: France ASSAINISEMENT - GC PINTO abilities Treatment: 20000 EH Works outlay: about 6 € 000k (exclusive of tax) Location: Aubergenville (78) Market in November 2007 Concluded The wastewater treatment plant was Introduced into the landscape and designed in order to ESTABLISH a link Which would enable a live connection entre le weft and the surrounding farming
Image
Links;
Related Industries
Key Words :
|
|